/Products/drilling blasting underground stopes

drilling blasting underground stopes

Drilling & Blasting of Underground Stopes

2017-4-4  Drilling & Blasting of Underground Stopes. Drilling in stopes is done with pneumatic-feed stopers, light handheld hammer drills of the jackhammer type and

get price

(PDF) Blast design for underground long hole stope to

Longhole stoping with ring drilling is best suited method for large scale production from exploitation of nearly vertical ore deposit. However production blasting in underground stope beneath

get price

bba Underground stope drill and blast designs

2015-8-27  Underground stope drill and blast designs optimization program. The easiest way to mine valuable orebodies is through the use of explosives and well-planned blasting layouts that produce fragmentation profiles designed specifically for conveyance equipment in underground mines. The design of blasting

get price

Underground Stoping Practice & Methods

2017-4-4  Drilling & Blasting of Underground Stopes . How to Handle Ore in Stopes. With some methods of stoping, the broken ore moves by gravity directly to the loading

get price

Investigation of stope blast designs in a deep

Investigation of stope blast designs in a deep underground mine through vibration analysis B Mohanty et al. 526 Deep Mining 2014, Sudbury, Canada mining (VRM). It involves drilling a raise bore or blasting a slot raise using large diameter boreholes. The production holes

get price

Underground Mining Methods UFRGS

2009-12-7  Underground Mining Methods and Applications Production Headframe Hans Hamrin* 1.1 INTRODUCTION stopes can be large, and big drill jumbos can be used for mecha- nized drilling. holes and for conventional bench blasting. Horizontal drilling

get price

Mining working safely around blasthole stopes

2019-12-12  underground mining operations can refer to on what are the hazards that are associated with this type of mining and ensure that controls and practices are implemented at the workplace to mitigate hazards. This document focuses only on “NON-ENTRY” blasthole production stopes

get price

Drilling nvp-pgf

DRILLING PATTERN Toe spacing: less than 2.4 m (8 ft). Burden: 1.8 m (6 ft). Hole diameter: 63 mm and 76 mm (2.5 in and 3 in). If the stope is narrow, at least 4 holes are drilled on a section. The sections are drilled vertically upward. DRILLING SEQUENCE Ideally, if the stope is small, it is entirely drilled before blasting.

get price

Ring Blasting Design Modeling and Optimization

2017-7-4  Ring Blasting Design Modeling and Optimization María Rocha, Rocha Blast Engineers, Spain & Roberto Laredo, Real Miners Consulting S.L., Spain Benjamín Cebrián, Blast-Consult S.L., Spain Abstract Ring blasting designs have to achieve different goals in order to become efficient whether is done in up hole or downhole fashion.

get price

bba Underground stope drill and blast designs

2015-8-27  Underground stope drill and blast designs optimization program. The easiest way to mine valuable orebodies is through the use of explosives and well-planned blasting layouts that produce fragmentation profiles designed specifically for conveyance equipment in underground mines. The design of blasting

get price

Investigation of stope blast designs in a deep

Investigation of stope blast designs in a deep underground mine through vibration analysis B Mohanty et al. 526 Deep Mining 2014, Sudbury, Canada mining (VRM). It involves drilling a raise bore or blasting a slot raise using large diameter boreholes. The production holes

get price

Mining working safely around blasthole stopes

2019-12-12  underground mining operations can refer to on what are the hazards that are associated with this type of mining and ensure that controls and practices are implemented at the workplace to mitigate hazards. This document focuses only on “NON-ENTRY” blasthole production stopes

get price

12. Mining methods and method selection

2018-1-30  12.4 Underground mining method •Shrink (Shrinkage) stoping-Applied to vertical or subverticaladvance of mining in a stope.-Broken ore used as both a working platform and temporary support.-Drilling & blasting ®ore extraction ®scaling & supporting.-30~35% of the freshly broken ore is drawn from the base of the stopeafter

get price

Drilling nvp-pgf

DRILLING PATTERN Toe spacing: less than 2.4 m (8 ft). Burden: 1.8 m (6 ft). Hole diameter: 63 mm and 76 mm (2.5 in and 3 in). If the stope is narrow, at least 4 holes are drilled on a section. The sections are drilled vertically upward. DRILLING SEQUENCE Ideally, if the stope is small, it is entirely drilled before blasting.

get price

Stope sequencing QueensMineDesignWiki

2019-6-28  A footwall extraction drive is developed in which drilling, blasting, and subsequent mucking is conducted in order to extract the stopes. To reinforce the hangingwall in the primary stopes the use of cablebolts or leaving permanent pillars within the secondary stopes is recommended .

get price

SUB-LEVEL OPEN STOPING: DESIGN OF THE O640, L651

2014-12-10  SUB-LEVEL OPEN STOPES IN THE 3000 OREBODY OF THE MOUNT ISA COPPER MINES, QUEENSLAND, AUSTRALIA • Development and Drilling • Production and Firing (Blasting) • Ventilation • Services • Filling All stopes go through various design stages before actual work starts underground. These

get price

Long hole drilling applied to narrow reef mining

2009-8-26  Blasting trials in the 1.6 metre high stope had indicated a three row drilling pattern with the centre row staggered, and a spacing of one metre between holes in any one row. Blasting using cordtex and Magnum cartridges was very successful, leaving full barrels along the stope. With limited blasting it was difficult evaluate rock throw.

get price

SOME METHODOLOGICAL DRILLING BLASTING

2018-1-18  UNDERGROUND MINING ENGINEERING 31 (2017) 17-30 UDK 62 UNIVERSITY OF BELGRADE FACULTY OF MINING AND GEOLOGY ISSN 03542904 Professional paper SOME METHODOLOGICAL DRILLING BLASTING PARAMETERS IN THE EXCAVATION OF TUNNEL Risto Dambov 1, Nikolinka Doneva 1, Marija Hadzi-Nikolova 1 Received: October 12, 2017 Accepted:

get price

Ring Blasting Design Modeling and Optimization

2017-7-4  Ring Blasting Design Modeling and Optimization María Rocha, Rocha Blast Engineers, Spain & Roberto Laredo, Real Miners Consulting S.L., Spain Benjamín Cebrián, Blast-Consult S.L., Spain Abstract Ring blasting designs have to achieve different goals in order to become efficient whether is done in up hole or downhole fashion.

get price

bba Underground stope drill and blast designs

2015-8-27  Underground stope drill and blast designs optimization program. The easiest way to mine valuable orebodies is through the use of explosives and well-planned blasting layouts that produce fragmentation profiles designed specifically for conveyance equipment in underground mines. The design of blasting patterns is specific to not only the

get price

Underground Stope Drill and Blast Designs Optimisation

2015-8-24  Underground stope drill and blast designs optimisation program, in Proceedings 11th International Symposium on Rock Fragmentation by Blasting, pp 137–148 (The Australasian Institute of Mining and Metallurgy: Melbourne).

get price

Investigation of stope blast designs in a deep

Investigation of stope blast designs in a deep underground mine through vibration analysis B Mohanty et al. 526 Deep Mining 2014, Sudbury, Canada mining (VRM). It involves drilling a raise bore or blasting a slot raise using large diameter boreholes. The production holes

get price

6-3 Drilling and Blasting Stopes Tm3 Mining Nature

2019-6-29  6-3 Drilling and Blasting Stopes Tm3 Free download as Powerpoint Presentation (.ppt), PDF File (.pdf), Text File (.txt) or view presentation slides online. drilling and blasting stope

get price

Stope sequencing QueensMineDesignWiki

2019-6-28  A footwall extraction drive is developed in which drilling, blasting, and subsequent mucking is conducted in order to extract the stopes. To reinforce the hangingwall in the primary stopes the use of cablebolts or leaving permanent pillars within the secondary stopes

get price

SUB-LEVEL OPEN STOPING: DESIGN OF THE O640, L651

2014-12-10  SUB-LEVEL OPEN STOPES IN THE 3000 OREBODY OF THE MOUNT ISA COPPER MINES, QUEENSLAND, AUSTRALIA • Development and Drilling • Production and Firing (Blasting) • Ventilation • Services • Filling All stopes go through various design stages before actual work starts underground. These

get price

Drilling and Blasting Micon International

Drilling and Blasting Micon International. Micon also offers a wide range of consultancy services pertaining to drilling and blasting in surface and underground mines. The services include blast audits, problem solving, blast optimisation and training. Blast Audits All aspects of the drilling and blasting will be assessed including

get price

Underground Drilling International Mining

2012-6-1  In this month’s Spotlight Feature Article, from the pages of the June 2012 issues of International Mining, Editor Paul Moore reports that Underground Drilling remains a challenging environment, so continued improvements from key machine and component suppliers continues to help mines improve efficiency, particularly as operations go deeper.

get price

Case Study Underground Mass Blast

2011-9-2  Fig 2: Mass blast area showing some of the drill holes. The blast holes needed to be drilled to extract 430,000t of ore from three separate rib pillars and a crown pillar. This would then allow waste rock fill from the overlying stopes to flow in and support the void. Whilst drilling was being carried out failure of

get price

Ring Blasting Design Modeling and Optimization

2017-7-4  Ring Blasting Design Modeling and Optimization María Rocha, Rocha Blast Engineers, Spain & Roberto Laredo, Real Miners Consulting S.L., Spain Benjamín Cebrián, Blast-Consult S.L., Spain Abstract Ring blasting designs have to achieve different goals in order to become efficient whether is done in up hole or downhole fashion.

get price